Create professional RAMS in minutes
Describe the job, answer a few questions and generate job-specific Risk Assessments and Method Statements for your next project.
Describe the job
Install 18 solar panels on a warehouse roof.
Built for UK contractors, tradespeople and subcontractors.
From £14.90 · No subscription required

We’ve identified:
- Electrical work
- Isolation required
- Power tools
- Work in occupied premises
- Manual handling
- Access equipment
Job-specific
Documentation tailored to the actual work.
Ready in minutes
Complete the job details and generate your document.
Fully editable
Review and change every section.
Reusable
Duplicate previous RAMS for similar jobs.
From job description to RAMS in 3 steps
Describe the job
“Install 18 solar panels on a warehouse roof.”
Answer relevant questions
- Is there work at height?
- Will power tools be used?
- Are other contractors working on site?
- Will chemicals be used?
- Is electrical isolation required?
- Will a MEWP be used?
- Is the site occupied?
Generate and review
- Risk Assessment
- Method Statement
- PPE requirements
- Emergency arrangements
- Job checklist
Written on site, not in the office
Stop writing RAMS in the van at 9pm
Prepare the paperwork on your phone between jobs, review every section and issue it before you reach the next site.
0 min
Typical time to a first draft
0+
Trades covered
£0.00
Single RAMS, no subscription
The document your site is asking for
One RAMS covers the risk assessment and the method statement for the job in hand.
RAMS
A Risk Assessment and Method Statement in one document — hazards, control measures, the work sequence, PPE and emergency arrangements for the job in hand.
Create RAMSBuilt for the trades
Documentation prepared around the way each trade actually works on site.












Try the RAMS generator
A simulated preview of the first step of the generator.
No analysis yet
Describe the work and select “Analyse job” to see an example of the hazards the platform would prompt you to review.

Brief the team from the document you issued
Paperwork the site actually accepts
Every document is structured the way principal contractors expect to receive it — scope, hazards, controls, PPE, emergency arrangements and a pre-start checklist.
- Hazards and control measures set out in a risk grid
- A method statement written as a numbered sequence
- PPE and competency requirements for the operatives on site
- A pre-start checklist you can sign off before work begins
Simple pricing
Create one RAMS, buy a pack or generate unlimited documents with Pro.
Single RAMS
One-off payment
- 1 RAMS document
- Risk Assessment
- Method Statement
- Hazard identification
- Control measures
- PPE requirements
- Emergency arrangements
- Job checklist
- Editable document
- PDF download
No subscription
Pack 5
One-off payment
5 RAMS · £5.98 per RAMS
- 5 RAMS documents
- Risk Assessments
- Method Statements
- Editable documents
- PDF downloads
- Document history
- Duplicate previous jobs
One-off payment · No automatic renewal · Credits remain available until used
Pro
Generate as many RAMS as you need.
Unlimited RAMS
- Unlimited RAMS
- Everything in Pack 5
- Unlimited Risk Assessments
- Unlimited Method Statements
- Saved company details
- Saved workers
- Saved equipment
- Job templates
- Duplicate jobs
- Full document history
- Priority support
Cancel anytime
Single RAMS — £14.90
Pack 5 — £29.90
Pro — £39.90/month unlimited
Creating RAMS every week? Go unlimited with Pro.
Common questions
Everything contractors usually ask before their first RAMS.
See all FAQsStill stuck? info@ramspal.co.uk
Your next RAMS is about six minutes away
No subscription and no templates to wrestle with. Describe the job and review what comes back.
RAMS Pal is a documentation support tool. Generated content must be reviewed and adapted to the actual work, site conditions, workforce, equipment and applicable health & safety requirements.