RAMS for Roofers
Create job-specific Risk Assessments and Method Statements for roofing work in minutes.
From £14.90 · No subscription required

Roofers working at height with edge protection in place
What a RAMS for roofers has to show
A roofing RAMS is judged on how it prevents falls, because falls from height remain the most common cause of fatal injury in UK construction. The Work at Height Regulations 2005 require the work to be planned, supervised and carried out with collective protection such as edge protection or guarded scaffolds before any reliance on harnesses, and a site will look for that hierarchy in the document.
A RAMS Pal document for roofing work asks how the roof is accessed, what the working height is, whether the public are below and how materials get up and down. The answers become the access arrangements, the edge protection and exclusion zones, the falling-object controls and the weather limits in the method statement, alongside the manual handling of tiles, sheets and rolls and the interface with the public below.
Pitched roof repairs, flat roof re-covering, leadwork, gutter replacement, fascia and soffit work and roof inspections all use the same set of questions, so a small firm can issue a document for each job rather than reuse a generic one the site will reject.
Typical jobs
- Pitched roof repairs
- Flat roof re-covering
- Leadwork
- Gutter replacement
- Fascia and soffit works
- Roof inspections
Typical hazards
- Working at height
- Falling objects
- Adverse weather
- Fragile surfaces
- Manual handling
- Public interface
Legislation and guidance
The regulations and guidance a RAMS for roofers is read against, and that the generated document cites where its hazards apply.
Work at Height Regulations 2005
Plan and supervise the work, prefer collective protection, and control fragile surfaces and falling objects.
HSE HSG33 Health and safety in roof work
The guidance sites measure a roofing method statement against: access, edge protection, fragile roofs, weather.
Construction (Design and Management) Regulations 2015
Planning, managing and monitoring the work and coordinating with others on site.
Personal Protective Equipment at Work Regulations 1992
Harnesses to EN 361, helmets with chinstraps to EN 397 and footwear to EN ISO 20345, supplied and inspected.
Manual Handling Operations Regulations 1992
Tiles, slates, sheets, felt rolls and lead moved to and across the roof.
Issued in the format the site expects
Hazards, control measures and residual risk scored line by line, with a method statement your operatives can follow step by step.
How it works
Describe the job
Write the work in plain English.
Answer relevant questions
Site, workers, equipment, access and hazards.
Generate and review
Edit every section before you issue it.
Example RAMS

Roof Repairs — Pitched Roof at 8m
Localised repairs to a pitched slate roof at approximately 8 metres, including replacement of damaged slates, leadwork repairs and gutter clearance from a scaffold with edge protection.
View example documentPricing
Single RAMS
One-off payment
- 1 RAMS document
- Risk Assessment
- Method Statement
- Hazard identification
- Control measures
- PPE requirements
- Emergency arrangements
- Job checklist
- Editable document
- PDF download
No subscription
Pack 5
One-off payment
5 RAMS · £5.98 per RAMS
- 5 RAMS documents
- Risk Assessments
- Method Statements
- Editable documents
- PDF downloads
- Document history
- Duplicate previous jobs
One-off payment · No automatic renewal · Credits remain available until used
Pro
Generate as many RAMS as you need.
Unlimited RAMS
- Unlimited RAMS
- Everything in Pack 5
- Unlimited Risk Assessments
- Unlimited Method Statements
- Saved company details
- Saved workers
- Saved equipment
- Job templates
- Duplicate jobs
- Full document history
- Priority support
Cancel anytime
Single RAMS — £14.90
Pack 5 — £29.90
Pro — £39.90/month unlimited
FAQ
Guides
- What is a RAMS document?
- How to write a method statement
- RAMS vs risk assessment: what is the difference?
- When do you need a RAMS? UK requirements explained
- Working at height risk assessment: what it must cover
- COSHH assessments for contractors
- CDM 2015 for small contractors and sole traders
- What principal contractors check in a RAMS
Page last reviewed 5 September 2026.
RAMS Pal is a documentation support tool. Generated content must be reviewed and adapted to the actual work, site conditions, workforce, equipment and applicable health & safety requirements.
