RAMS for Electricians
Create job-specific Risk Assessments and Method Statements for electrical work in minutes.
From £14.90 · No subscription required

Electrician working on a commercial distribution board
What a RAMS for electricians has to show
An electrical RAMS has to show the site how the supply will be isolated, proved dead and kept that way while the work is done. Principal contractors and facilities managers read the isolation steps before anything else, because the Electricity at Work Regulations 1989 require work on dead equipment wherever possible and put the burden on the contractor to show live working was unavoidable.
A RAMS Pal document for electrical work builds that in. Confirm that isolation is required and the method statement includes locking off, proving dead with a GS38-compliant tester and the permit to work the site will expect; the hazards section scores electric shock, arc flash and work at height on a 5×5 matrix with the controls beside them. Distribution board replacements, commercial rewires, periodic inspection and testing, EV charge point installation and emergency lighting works are all covered by the same set of questions.
The document also carries what the site checks alongside the electrical detail: the ECS or CSCS cards your operatives hold, the 110 V tools and test equipment with their inspection status, the PPE schedule to standard, and the emergency arrangements for an electrical injury.
Typical jobs
- Distribution board replacement
- Commercial rewires
- Periodic inspection and testing
- EV charge point installation
- Emergency lighting works
- Containment and cable tray installation
Typical hazards
- Electrical shock
- Working at height
- Manual handling
- Public interface
- Cuts
- Dust
Legislation and guidance
The regulations and guidance a RAMS for electricians is read against, and that the generated document cites where its hazards apply.
Electricity at Work Regulations 1989
Work on dead systems unless live working is unavoidable; safe isolation, competence and suitable test equipment.
BS 7671 (IET Wiring Regulations) and HSE GS38
Installation and testing standards, and the test-equipment guidance a proving unit and voltage indicator must meet.
Work at Height Regulations 2005
Containment, lighting and cable tray work from steps, towers and MEWPs.
Construction (Design and Management) Regulations 2015
Every contractor must plan, manage and monitor their work and hand the principal contractor the information to check it.
Provision and Use of Work Equipment Regulations 1998
Inspection and safe use of power tools, test equipment and access equipment.
Issued in the format the site expects
Hazards, control measures and residual risk scored line by line, with a method statement your operatives can follow step by step.
How it works
Describe the job
Write the work in plain English.
Answer relevant questions
Site, workers, equipment, access and hazards.
Generate and review
Edit every section before you issue it.
Example RAMS

Distribution Board Replacement — Occupied Office
Replacement of a three-phase distribution board within an occupied commercial office, including safe isolation, temporary supply arrangements, circuit identification, installation and testing.
View example documentPricing
Single RAMS
One-off payment
- 1 RAMS document
- Risk Assessment
- Method Statement
- Hazard identification
- Control measures
- PPE requirements
- Emergency arrangements
- Job checklist
- Editable document
- PDF download
No subscription
Pack 5
One-off payment
5 RAMS · £5.98 per RAMS
- 5 RAMS documents
- Risk Assessments
- Method Statements
- Editable documents
- PDF downloads
- Document history
- Duplicate previous jobs
One-off payment · No automatic renewal · Credits remain available until used
Pro
Generate as many RAMS as you need.
Unlimited RAMS
- Unlimited RAMS
- Everything in Pack 5
- Unlimited Risk Assessments
- Unlimited Method Statements
- Saved company details
- Saved workers
- Saved equipment
- Job templates
- Duplicate jobs
- Full document history
- Priority support
Cancel anytime
Single RAMS — £14.90
Pack 5 — £29.90
Pro — £39.90/month unlimited
FAQ
Guides
- What is a RAMS document?
- How to write a method statement
- RAMS vs risk assessment: what is the difference?
- When do you need a RAMS? UK requirements explained
- Working at height risk assessment: what it must cover
- COSHH assessments for contractors
- CDM 2015 for small contractors and sole traders
- What principal contractors check in a RAMS
Page last reviewed 5 September 2026.
RAMS Pal is a documentation support tool. Generated content must be reviewed and adapted to the actual work, site conditions, workforce, equipment and applicable health & safety requirements.
