RAMS for Solar Installers
Create job-specific Risk Assessments and Method Statements for solar PV installations in minutes.
From £14.90 · No subscription required

Contractor in hi-vis reviewing job paperwork on a tablet on a solar rooftop at sunset
What a RAMS for solar installers has to show
A solar PV RAMS combines two things sites check hardest: work at height and electrical work on a system that cannot be switched off. Panels generate DC voltage as soon as they see daylight, so the document has to show how strings are kept isolated and how the DC side is treated as live throughout, as well as how the roof is accessed and protected.
A RAMS Pal document for solar work asks about the roof, the access method, whether panels are lifted by MEWP, hoist or crane, and whether electrical isolation is required. The answers produce the edge protection and roof access controls, the lifting arrangements, the isolation steps in the method statement, and the PPE schedule for both hazards; the DC-live warning is written into the electric shock hazard row.
Rooftop arrays on commercial and domestic roofs, ground-mount systems, inverter and battery storage installation, DC cabling and panel replacement are all covered, and the competencies section records the cards and MCS-related qualifications your operatives hold.
Typical jobs
- Rooftop PV arrays
- Ground-mount systems
- Inverter installation
- DC cabling
- Battery storage
- Panel replacement
Typical hazards
- Working at height
- Electrical shock
- Falling objects
- Manual handling
- Adverse weather
- Lifting operations
Legislation and guidance
The regulations and guidance a RAMS for solar installers is read against, and that the generated document cites where its hazards apply.
Work at Height Regulations 2005
Roof access, edge protection, fragile surfaces and falling objects during panel installation.
Electricity at Work Regulations 1989
DC strings are live in daylight; isolation, competence and test equipment for the AC and DC sides.
Lifting Operations and Lifting Equipment Regulations 1998
Panels and rails lifted by MEWP, hoist or crane need a planned lift and inspected equipment.
IET Code of Practice for Grid-connected Solar Photovoltaic Systems
The installation and commissioning practice a PV method statement is expected to follow.
Construction (Design and Management) Regulations 2015
Planning and coordination with the principal contractor or client, including on domestic projects.
Issued in the format the site expects
Hazards, control measures and residual risk scored line by line, with a method statement your operatives can follow step by step.
How it works
Describe the job
Write the work in plain English.
Answer relevant questions
Site, workers, equipment, access and hazards.
Generate and review
Edit every section before you issue it.
Example RAMS

Solar Panel Installation — Warehouse Roof
Installation of 24 roof-mounted photovoltaic panels, mounting rails, DC cabling and a string inverter to the north elevation of an occupied distribution warehouse. Roof access will be gained via a MEWP with a temporary edge protection system to the working area.
View example documentPricing
Single RAMS
One-off payment
- 1 RAMS document
- Risk Assessment
- Method Statement
- Hazard identification
- Control measures
- PPE requirements
- Emergency arrangements
- Job checklist
- Editable document
- PDF download
No subscription
Pack 5
One-off payment
5 RAMS · £5.98 per RAMS
- 5 RAMS documents
- Risk Assessments
- Method Statements
- Editable documents
- PDF downloads
- Document history
- Duplicate previous jobs
One-off payment · No automatic renewal · Credits remain available until used
Pro
Generate as many RAMS as you need.
Unlimited RAMS
- Unlimited RAMS
- Everything in Pack 5
- Unlimited Risk Assessments
- Unlimited Method Statements
- Saved company details
- Saved workers
- Saved equipment
- Job templates
- Duplicate jobs
- Full document history
- Priority support
Cancel anytime
Single RAMS — £14.90
Pack 5 — £29.90
Pro — £39.90/month unlimited
FAQ
Guides
- What is a RAMS document?
- How to write a method statement
- RAMS vs risk assessment: what is the difference?
- When do you need a RAMS? UK requirements explained
- Working at height risk assessment: what it must cover
- COSHH assessments for contractors
- CDM 2015 for small contractors and sole traders
- What principal contractors check in a RAMS
Page last reviewed 5 September 2026.
RAMS Pal is a documentation support tool. Generated content must be reviewed and adapted to the actual work, site conditions, workforce, equipment and applicable health & safety requirements.
